DMA, in working with the City of Harper Woods to maximize their existing site, designed a 6,000-sq.ft. addition and 12,000-sq.ft. renovation for their public library. The plan adds larger windows and a barrel vault with clerestory windows that brings light down to the lower level of the building. The expanded and relocated children's area includes a craft and story room, a computer area, with adjacent family restroom, and a crawl-in reading cubbies for children. The Library was honored to become the first LEED public library in Michigan, having achieved LEED-Silver in September, 2007. Green design principles informed all project decision making including placement of sensors to turn of lights when natural light is abundant and requiring mandatory recycling on the construction site.
- Total Size 18,000
- Addition Size 6,000
- Renovation Size 12,000





